| System description | Advantages at a glance Cabling systems | Components |
|
|
|
Ecobus EIB Office actor B2D/2J stationary connection without wire-end stripping |
|
|
|
Ecobus Combi 5x2.5+2x1.5 Energy flat cable with an integrated date bus |
|
|
|
Ecobus EIB Combi Sensor Weather station and further sensors |
|
|
|
Ecobus Patch cables to the connection of the consumer to energy and/or the date bus |
|
|
|
Ecobus Combi connector 5x2.5+2x0.5 energy and date tap |
|
|
|
Ecobus Data-R 2x2x0.8 Bus cable to the connection of the bus users |
|
|
Ecobus EIB Actors and system components build in REG form |

The modern building installation demands control and automation for all building technical functions.Till now only energy can be distributed and when required switched with the conventional electrical building installation The increased requirements on modern building technology are now fulfilled by the Ecobus system. The modern Ecobus building management stands out due to a minimal cable effort, fast adaptability and flexible space use opposite to the conventional electrical installations. An investment protection is ensured until after decades with that. With Ecobus the most different, till now strictly separated, building technical functions, like radiator, climate, ventilation, lights, facility supervision and load management connected easily with each other for themselves. Control tasks can be carried out centrally, decentralized or automatic. The functions of bus users (actors and sensors) are freely programmable by the Ecobus data line. Every bus user at this provides his own intelligence and must not be contolled centrally. The flat cables and the suitable, pre-canned plug- and screwing components (connectors) make the wire-end stripping unnecessary and reduce the assembly time considerably.Changes or expansions of the installation can be carried out without great planning effort.
Flexible after-installations at reorganizations or use changes can be fast and easily carried out. Functions are executed and patched about the bus data line arbitrarily. With the energy flat cable line can be distributed the burden as required in the installation.Central, decentralized or automated control is possible. Different house technical installations can get connected to each other. The economic working sequence is guaranteed about the modern building installation. Energy and operating costs are lowered. Central control or supervision of all building technical functions is made possible. The needed cable length is minimized, by which the fire load is reduced.