Mounting instruction Economy-outlet 

pic_unipatch.gif (1907 Byte)


ES 2/8 "screened" 

Page 2

The set delivered includes:
pic_1.gif (184 Byte) central plastic cap 
pic_2.gif (207 Byte) screening metal cap
pic_3.gif (204 Byte) 2 insert wedges
pic_4.gif (210 Byte) plastic base plate for mainboard
pic_5.gif (204 Byte) metal base unit
pic_5.gif (204 Byte) jack insert, 2x screened RJ45 with LSA+ block
Break through the base unit for cable insertion (four possibilities). es2_8_2_2.jpg (14355 Byte)
Prepare the cable, according to the corresponding guidelines laid down by Dätwyler. 1002_4pes2_1_2.jpg (11053 Byte)
Insert cable and screening in the strain relief  about  5 - 10 mm.
In case of Class E/250MHz pass the  screening-pair until the LSA+ -block.

Page 2 but_fw.gif (884 Byte)